MRADI WA UMEME RUFIGI June 2021
JVACEE is a Joint venture company of Arab Contractors and El-sewedy Electric, dealing with the scope of Engineering, Procurement & Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in Tanzania, which is expected to produce 2,115 MW of installed capacity.
Project Objectives:
Generating electricity with capacity of 2115MW to satisfy energy needs in Tanzania Control water flow in the period of flooding and thus providing the necessary water requirement
Scope of Work:
-Main dam for storage of water to generate hydropower using RCC concrete for main dam with total length 1025m at crest level and 130m dam level
-Construction of 4 saddle dams for reservoir impounding of water with length of 1.4km, 7.9km, 4.6km and 2.6km with a maximum height 21.3m, 14m, 12.4m and 5.5m respectively, with a capacity to impound approximately 33 billion m3 of water
-Construction of a hydropower plant with a capacity of 2115mw and a substation of 400kv; in addition to 400kv transmission lines to the nearest point of the public network